dangling and floating objects in your design. New GUI allows the user to quickly locate and tidy hundreds of violation in just a few minutes. Automatically deletes dangling lines back to their source or completes the routing when inside the pad perimeter. Deletes Multiple vias at the same location, within a +/- 1 thou tolerance, leaving only the original via with the highest connectivity. Delete all floating (no netname), un-connected via's, tracks, shapes nets quickly and easily. |
Dangling Line Before | Dangling Line After | Duplicate Vias with +/- 1 thou offset |
New GUI allows the user to quickly navigate and fix violations. |